H2Move- Investimento idrogeno

Langur Holding Corporation
Bandiera del paese dell'emittenteSpagna

H2Move- Investimento idrogeno

Langur Holding Corporation
Bandiera del paese dell'emittenteSpagna

HVR Energy funding in order to build its first 20 hydrogen distribution stations (ACTIVA) intended to supply vehicles.

This project concerns HVR Energy corporate financing. The company will use the funds to build its first 20 hydrogen refueling stations (ACTIVA type).

The amount requested for the first round of funding is 1,500,000 euros, for a total of 5,000,000 euros, in several rounds, with an investment term of 48 months and an interest rate of 12%. The simple bonds issued are of senior range.

A pledge of 15% of the shares of the parent entity, Langur Holding Corporation, S.L. is settled as a guarantee.

L'offerta

Dettagli e caratteristiche dell'offerta

20 hydrogen refueling stations construction funding along the Trans-European Transport Network

HVR Energy offers an investment opportunity in the financing of the construction of its first 20 hydrogen refueling station in Spain.

The interest rate of the simple bonds issued as part of this project is 12%, with a duration of 48 months. The repayment strategy is in fine with an annual interest payment.

These are regulated by Spanish jurisdiction.

The repayment strategy is based on increasing equity and on obtaining grants. The promise will cover the 15% of the shares of Langur Holding Corporation, S.L. the parent company.

illustration H2Move

Specifiche

Restano
14 giorni
Investimento minimo
10 €
Investimento massimo
711.950 €
Valore unitario
10 €
Pagamento degli interessi
annualizzato
Posizione nel crowdfunding
Vedere la documentazione

Fasi di investimento

A partire dal 27 marzo 2025 12:30
  • Investimento aperto a tutti
Fino al 16 aprile 2025 23:59

Fine della raccolta

La data di fine raccolta potrebbe essere estesa su richiesta del promotore del progetto.
Il rendimento del tuo investimento sarà calcolato a partire dalla data di generazione dei certificati d'investimento, ovvero una volta ricevuti l'intero importo dei fondi e la documentazione legale firmata dal promotore del progetto.

Risorse

DocumentazioneAppendiciRischi

Simulatore

Se investo

|

Simulazione di investimento
H2Move - Obligation 12%/anno su 4 anni
Simulazione - Tasso: 12% / anno per 4 ans

Investimento iniziale:

1.000 €

Rimborsi e interessi:

1.480 €

In 4 rate

DataInteressi*CapitaleImporto
16/04/2026120 €0 €120 €
16/04/2027120 €0 €120 €
16/04/2028120 €0 €120 €
16/04/2029120 €1.000 €1.120 €
Totale480 €1.000 €1.480 €

Il risultato presentato non costituisce una previsione delle future performance dei tuoi investimenti. Ha solo lo scopo di illustrare i meccanismi del tuo investimento nel corso del periodo di investimento. L'andamento del valore del tuo investimento può discostarsi da quanto visualizzato, sia al rialzo che al ribasso.




Il progetto

Cosa finanzierà il tuo investimento?

HVR Energy is a Spanish company founded in 2020 that develops hydrogen refueling stations and currently operates a project for production, storage, and distribution of green hydrogen in Coslada (Spain). This first installation serves as a show platform.

illustration HVR Energy

The company produces and distributes green hydrogen by purchasing electricity through green energy contracts.

The company offers solutions in various sectors and for various applications:

  • Mobility: urban mobility, interurban mobility, and light vehicles
  • Logistics: heavy transport, light transport, last-mile transport, as well as forklifts
  • Data centers:Memorandum of Understanding signed with Nvidia and certified as official H2 supplier to supply hydrogen in Nvidia data center backup systems

HVR energy works with car manufacturers, energy companies, and logistics companies to promote the use of hydrogen.

ACTIVA Type Stations:

ACTIVA is a distribution hydrogen project. This type of station will be installed in existing gas stations or directly in the facilities of companies that require a hydrogen supply (such as logistics operators and car manufacturers).

illustration H2Move

Features of an ACTIVA station:

  • Distribution: dual connection at 350 bar and 700 bar
  • Installed power: 15 kW
  • Dispensing capacity: 1 ton/day
  • Storage system: 900 bar
  • Occupied surface: 20 m²
  • Construction time: 6 to 8 months

The technology has been developed by Wolftank, an Austrian group and global player in energy solutions.

illustration HVR Energy

The 20 stations funding is part of a larger deployment strategy that foresees a total of 75 ACTIVA stations across Spain. Exact locations have not been precisely defined yet as the client will decide the exact location at the time of signing the contract.

Possible installation locations for the first 20 stations

The company development is based on an increase in capital and also on the support of European organizations:

  • EIT (European Institute of Innovation & Technology)
  • CEF (Connecting Europe Facility – European Commission)
  • ICO (Instituto de Crédito Oficial)

The company has structured its operation by dividing it into implementation phases that are named after the awarded grant.

  • EIT: 1 station (grant awarded)
  • PATSYD: 4 stations
  • CEF 20: 20 stations (grant awarded)
  • CEF 50: 50 stations

With the installation of the first 20 stations, HVR Energy aims to demonstrate the reliability of its model and gain credibility before launching a fundraising equity campaign.

The crowdfunding is carried out within the framework CEF 20 for which the grant has already been awarded.

Business Model:

1) The ACTIVA stations will be leased to two types of clients for a monthly rental:

  • Traditional fuel companies with a distribution network settled
  • Companies using hydrogen vehicles (cars, buses, trucks, forklifts)

In this way, HVR Energy ensures part of its income that will not be directly affected by hydrogen demand.

2) In addition, HVR Energy will also receive a commission of 0.5 € per kg of hydrogen sold.

The press is talking about the project!

  • https://elperiodicodelaenergia.com/hvr-energy-recibe-ayudas-de-los-fondos-europeos-para-instalar-20-hidrolineras-en-espana/
  • https://hidrogeno-verde.es/proyecto-hvr-energy-movilidad-hidrogeno/
  • https://elperiodicodelaenergia.com/eit-apoya-la-propuesta-de-hvr-energy-para-potenciar-la-movilidad-impulsada-por-hidrogeno/
  • https://www.bolsamania.com/noticias/empresas/economia–eit-apoya-la-propuesta-de-hvr-energy-para-potenciar-la-movilidad-impulsada-por-hidrogeno–18957380.html
  • https://elmercantil.com/2025/02/24/la-comision-europea-apoya-con-65-millones-seis-proyectos-espanoles-en-fueles-verdes/

Promotori del progetto

Chi realizzerà il progetto?
Langur Holding Corporation
Bandiera del paese dell'emittenteSpagna

Langur Holding Corporation

Founded in 2016, Langur Holding Corporation (LHC), a Spanish company, is a private entity created to manage minority and majority stakes in a variety of companies in Europe, LATAM, and GCC (Gulf Cooperation Council) countries.

Langur provides strategic consulting, business structuring expertise, and market penetration services to all the companies it invests in, across the following sectors:

  • Energy sector
  • Fintech
  • Home services

The subsidiary Langur Portugal is dedicated to the development, construction, and operation of photovoltaic assets in Portugal.

2024
5.5 MWp already in service / 25 MWp of new developments in RTB phase / The entire portfolio is owned by WildSprout (50% of Langur Portugal).
2025
18 MW under negotiation (UPP) + 2 MW of distributed production / Energy communities: Pilot project of 10 MW (initial development) / Project development is carried out within Langur Portugal.
2028 (goals)
The goal is to develop, construct, and commission approximately 160 MWp by 2028: Decentralized production (self-consumption): 6 MWp / Decentralized production (UPP): 40 MWp / Decentralized production (energy communities): 10 MWp / Public utility scale (feed-in tariff): 3.5 MWp / Public service scale (market): 100 MWp.
Leggi di piùRiduci

Analisi

Quali sono i rischi e le misure di mitigazione proposte?
Scarica la nostra analisi completa

Panoramica dei rischi

Rischio di commercializzazione

Commercializzazione

Rischio legato alla commercializzazione di una nuova offerta

Mezzi di mitigazione

HVR Energy desarrolla numerosas asociaciones para garantizar una sólida cartera de clientes.

Rischio di costruzione

Assemblaggio

Rischio legato a errori o difetti durante l'assemblaggio che possono influire sulla qualità finale del prodotto

Mezzi di mitigazione

La primera estación ACTIVA está en construcción. El grupo Wolftank, responsable del montaje de las estaciones, tiene una gran experiencia. Wolftank, que fabrica las estaciones, es un grupo de renombre internacional que ya ha desarrollado proyectos de hidrógeno.

Rischio di costruzione

Aumento del CAPEX

Rischio di aumento dei costi di costruzione a causa dell'aumento dei prezzi delle materie prime

Mezzi di mitigazione

La primera estación ACTIVA está en construcción, lo que permitirá verificar las estimaciones de tiempo. El volumen de estaciones en construcción ayudará a reducir costes. HVR Energy también tiene una instalación principal que sirve como centro de desmantelamiento. Esta instalación también permitió una mejor comprensión de las estimaciones.

Rischio di costruzione

Ritardo

Rischio di ritardi nella costruzione o addirittura di mancato completamento dei lavori

Mezzi di mitigazione

Las estaciones se construyen en una línea de producción en plazos muy cortos.

Rischio di controparte

Mercati emergenti

Rischio associato ai mercati emergenti in cui sono presenti solo uno o pochi acquirenti di energia, non necessariamente con un solido bilancio o una solida storia creditizia

Mezzi di mitigazione

El mercado del hidrógeno aún no está maduro. La demanda de hidrógeno para la movilidad sigue siendo baja, pero los distintos actores nacionales y europeos han manifestado su deseo de incluir el hidrógeno en el mix energético.

Rischio di sviluppo

Autorizzazioni

Rischio relativo alle autorizzazioni rilasciate alla società e ai terreni e ai ricorsi di terzi contro le autorizzazioni rilasciate.

Mezzi di mitigazione

Las primeras 20 estaciones ACTIVA se desplegarán dentro de estaciones de servicio tradicionales. Estas estaciones no requieren modificaciones significativas.

Rischio di rifinanziamento

Rifinanziamento

Rischio di credito relativo alla capacità della società di rifinanziare e onorare i propri debiti.

Mezzi di mitigazione

HVR Energy cuenta con asesoramiento sobre cómo maximizar las oportunidades de subvenciones y ha contratado una consultoría para recaudar fondos. La subvención para la fase CEF 20 ya ha sido concedida, mientras que la de la fase CEF 50 depende del mismo establecimiento.

Rischio di mercato

Macroeconomia

Questo rischio può essere causato, ad esempio, da un cambiamento delle circostanze macroeconomiche, da una riduzione della domanda nel settore in cui opera il progetto di equity crowdfunding e dalla dipendenza da altri settori

Mezzi di mitigazione

El mercado del hidrógeno aún no está maduro. La demanda de hidrógeno para la movilidad sigue siendo baja, pero los distintos actores nacionales y europeos están demostrando su voluntad de integrar el hidrógeno en el mix energético.

Rischi operativi

Tecnologia

Rischio tecnologico che il sistema non funzioni come previsto o che le prestazioni si deteriorino più rapidamente del previsto

Mezzi di mitigazione

Una primera estación de demostración está operativa en Colsada, España. Esta estación permite demostrar el buen funcionamiento de los proyectos GENESIS y ACTIVA. Ha comenzado la construcción de la primera estación ACTIVA. Wolftank, que fabrica las estaciones, es un grupo de renombre internacional y con experiencia en el desarrollo de proyectos de hidrógeno.

L’investimento in questo progetto di equity crowdfunding comporta dei rischi, compreso il rischio di perdita totale o parziale del capitale investito. Il tuo investimento non è coperto dai sistemi di garanzia dei depositi istituiti ai sensi della direttiva 2014/49/UE del Parlamento europeo e del Consiglio. Il tuo investimento non è inoltre coperto dai sistemi di indennizzo degli investitori istituiti ai sensi della Direttiva 97/9/CE del Parlamento europeo e del Consiglio. Il rendimento dell’investimento non è garantito. Non si tratta di un prodotto di risparmio e si consiglia di non investire più del 10% del proprio patrimonio netto in progetti di finanziamento partecipativo. Potreste non essere in grado di vendere gli strumenti di investimento quando lo desiderate. Se riuscite a venderli, potreste comunque subire delle perdite.

Commenti

Le tue domande, le nostre risposte
Per lasciare un commento è necessario aver effettuato il login e aver convalidato l'indirizzo e-mail.