Accelerate the energy transition by supporting 8 renewable projects in Spain and Italy.
The Solar&Storage Ambition project, led by the Green Enesys group, aims to finance the development of a portfolio of 8 renewable energy projects located in Spain and Italy.
This portfolio consists of 7 photovoltaic plants with a total capacity of 125 MW and a stand-alone battery storage project with a capacity of 65 MW.
This third funding tranche of €400,000 is currently open, as part of a maximum amount across all tranches of €4,800,000..
The funds raised will be used to finance the development costs of the projects, particularly the Spanish hybridization projects, for which we have obtained a technical audit report conducted by a specialized third party.
These four projects involve hybrid photovoltaic and battery energy storage (BESS) installations with a total capacity of 65 MW, located around Madrid (Spain).
The completion of this audit report was a prerequisite for the launch of this third tranche. The report covers the following elements:
- Site evaluation
- Preliminary environmental assessment
- Review of the land lease agreement
- Review of the grid connection solution
- Project design review
- Development process review
You will find more information on this topic in the ‘Project’ section, which we invite you to consult.
L'offerta
Financing a portfolio of solar and energy storage across Spain and Italy
Investment Opportunity
The Green Enesys Group offers an investment opportunity to finance a portfolio of 8 renewable energy projects located in Spain and Italy.
This portfolio, managed by the Spanish company Solar Ambition CF2 S.A., includes:
- 7 ground-mounted photovoltaic plants totaling 125 MW, including 4 hybrid projects with storage
- 1 stand-alone battery storage project (BESS) with a capacity of 65 MW.
Terms of the Offer and Refinancing
The objective of this fundraising is to set up a straightforward bond financing, structured in several tranches, with a total amount of €4.8 million and a maturity of 3 years.
The funds raised will be used for:
- the acquisition of the projects from the developers
- the financing of development costs until reaching RTB (Ready-To-Build) status.
Green Enesys intends to retain the assets in the long term, with a potential refinancing through bank debt or equity. Project sale may also be considered once the RTB stage is achieved.
Guarantees
Enerfip benefits from a first-ranking pledge on the company Bosque Desarrollos Fotovoltaicos España SL, which owns the project entities (SPVs) in Spain and Italy.
In the event of a default, activating this pledge will allow recovery of the residual asset value to ensure partial or full repayment to investors.
Specifiche
Fasi di investimento
- Investimento aperto a tutti
Fine della raccolta
Risorse
Simulatore
Simulazione di investimento
Solar & Storage Ambition T3 - Obligation 9%/anno su 2,8 anni
Simulazione - Tasso: 9% / anno per 2,8 ans
Investimento iniziale:
1.000 €
Rimborsi e interessi:
1.252 €
In 3 rate
| Data | Interessi* | Capitale | Importo |
| 26/12/2026 | 90 € | 0 € | 90 € |
| 26/12/2027 | 90 € | 0 € | 90 € |
| 26/10/2028 | 72 € | 1.000 € | 1.072 € |
| Totale | 252 € | 1.000 € | 1.252 € |
*Interessi lordi prima delle imposte, tutte le spese incluse (vedi tassazione) Le date sono indicative. Le date finali saranno disponibili una volta che il progetto sarà ufficialmente chiuso. Il risultato presentato non costituisce una previsione delle future performance dei tuoi investimenti. Ha solo lo scopo di illustrare i meccanismi del tuo investimento nel corso del periodo di investimento. L'andamento del valore del tuo investimento può discostarsi da quanto visualizzato, sia al rialzo che al ribasso. | |||
Il progetto
The proposed project involves financing 8 renewable energy projects, distributed between Spain and Italy, within the company Solar Ambition CF2 S.A.. This portfolio includes:
- 7 ground-mounted photovoltaic plants, with 1 in hybridization (with storage), for a total capacity of 125.36 MWc;
- 1 stand-alone BESS battery project with a capacity of 65 MWh.
Portfolio in Spain:
| Project | Typology | Capacity MWc | Storage Capacity MWh | Grid Connection | RtB Estimation |
|---|---|---|---|---|---|
| La Paz | Hybridization | 22.32 | 70.21 | Secured | Q1 2028 |
| El Coto | Hybridization | 6.02 | 20.06 | Secured | Q1 2028 |
| La Playa | Hybridization | 6.02 | 20.06 | Secured | Q1 2028 |
| La Cueva | Hybridization | 6.02 | 20.06 | Secured | Q1 2028 |
Total portfolio: capacity 40.38 MWc and storage capacity: 130.39 MWh
Portfolio in Italy:
| Project | Typology | Capacity MWc | Storage Capacity MWh | RtB Estimation |
|---|---|---|---|---|
| Giotto | PV | 18.88 | / | Q1 2026 |
| Verdi | PV | 50.90 | / | Q1 2027 |
| Cherubini | PV | 15.20 | / | Q1 2027 |
| BESS Sessa VI | Stand Alone | 65 | 624 | Q4 2026 |
Total portfolio: capacity 84.98 MWc and storage capacity: 65 MWh
Due Diligence:
Grid Connection:
The four projects have secured access to the distribution network from the distribution system operator (DSO), and the preliminary administrative authorization (AAP) has been officially requested for all installations.
Regarding hybridization, the integration of energy storage elements does not constitute a technological modification. Therefore, the installation can be considered unchanged for the network connection permit update.
Thus, no authorization issues currently prevent the integration of battery energy storage systems (BESS) into the photovoltaic plants.
Land:
The projects are in line with their current stage of development, and the proposed timeline for reaching Ready to Build (RtB) status is in line with expectations.
Portfolio Summary
- Total projects: 8 (7 PV + 1 BESS)
- Total capacity: 125.36 MWc (PV) + 65 MWh (BESS)
- Location: Spain (Madrid), Italy (Basilicata, Campania)
- Technology: PV + BESS
- RTB estimate: 2026–2028
Promotori del progetto
Analisi
L’investimento in questo progetto di equity crowdfunding comporta dei rischi, compreso il rischio di perdita totale o parziale del capitale investito. Il tuo investimento non è coperto dai sistemi di garanzia dei depositi istituiti ai sensi della direttiva 2014/49/UE del Parlamento europeo e del Consiglio. Il tuo investimento non è inoltre coperto dai sistemi di indennizzo degli investitori istituiti ai sensi della Direttiva 97/9/CE del Parlamento europeo e del Consiglio. Il rendimento dell’investimento non è garantito. Non si tratta di un prodotto di risparmio e si consiglia di non investire più del 10% del proprio patrimonio netto in progetti di finanziamento partecipativo. Potreste non essere in grado di vendere gli strumenti di investimento quando lo desiderate. Se riuscite a venderli, potreste comunque subire delle perdite.